Another great REYMSA installation in action!
Our closed-circuit skidded cooling tower package is now up and running at the Phoenix Pepsi facility — a great project supported by our representative, ThermAir Systems.
ThermAir Systems worked closely with Pepsi, Comfort Systems USA, and the project engineer to deliver a custom-engineered solution for managing the facility’s rejected RO water challenges.
Pepsi’s previous towers had a lifespan of only 2–3 years due to harsh water conditions. To drastically improve performance and durability, the new REYMSA system includes:
✔️ A fiberglass tower with UV- and corrosion-resistant coatings
- with Industrial-grade fill.
✔️ A titanium heat exchanger.
- with all stainless-steel hardware.